First floor:
Bright entrance area, open-plan living-dining room, fully equipped kitchen, pantry, guest toilet, 1 bedroom with en suite bathroom, access to the covered terrace, pool area with spacious sun terrace and beautifully landscaped Mediterranean garden.
Second floor
1 master bedroom with dressing room and en suite bathroom, 2 further bedrooms with en suite bathrooms
Basement
Utility room, storage room,
Construction is set to begin in September 2025 and is expected to take approximately 18 months.










